Which project is on which workstation? What a control center does in the workshop
In short
- In many workshops the production manager only knows which project is on which workstation after walking round the hall.
- A control center shows which panel is running at each workstation, records Start, Stop and Complete, and passes on a call or a shortage.
- Planning, stock, orders and prices stay in the company’s ERP; the control center plans nothing.
It is half past eight and the production manager is walking round the hall. At the saw station there is a package for the apartment building, at the first assembly table a wall panel is half sheathed, the second table has stopped. Why it stopped, he only hears once he is standing next to it: the window has not been delivered. In the office the owner wants to know whether the ground floor can leave this week. The answer is in the head of whoever just walked round.
Meanwhile a pdf from yesterday hangs at the workbench. This morning the drawing office changed the lintel of one panel, and that new version is in the model, not on the pdf at the table. Whoever builds the panel does not see the change, unless someone comes to tell them.
That is not carelessness by the people in the hall. A workshop with six or ten workstations simply has no place where everything comes together: which project is where, which panel is running, what has stopped and why, who needs help. Today you build that overview with your legs.
Why walking round is not enough
Walking round gives a snapshot. By the time you reach the last workstation, the first one has moved on or stopped. A quarter of an hour of standstill at a table you just missed goes unnoticed. And what you do see is written down nowhere: how long a panel lay on the table, how often a station waited for materials, who called the drawing office about which dimension.
Then there is the question of which version is on the floor. A drawing office often publishes a model more than once: to discuss it, to have a detail checked, to take in a change from the client. If every publication reaches the workstations straight away, someone may be building a version that was not yet meant to be built. A mistake in the workshop then repeats itself in every panel, long before anyone sees it on site.
What a control center does
A control center is a screen for the production manager with one line per workstation, fed by the workstations themselves. It works with what is already there: the screen at the workbench, with the model and the drawings on it.
Only released work reaches the floor. A project or a part of it, for example the walls of the ground floor, reaches the workstations the moment someone releases it for execution. Until then the model belongs to the drawing office, however often it publishes. After the release every workstation shows the released version. Who released, when and which version, is in the log.
The state of each workstation, right now. The workstation itself says whether it is busy, stopped with a reason, free or offline. Next to it are the project, the panel that is running and the time since Start. Whoever keeps that screen open does not need to walk round the hall to know where each project stands.
Start, Stop and Complete on the whole panel. At the workbench the operator chooses which panel to take and taps Start. Stop asks for one reason from the company’s list, Complete signs the panel off at that workstation. There is no list of parts to tick off and no imposed order. Every tap is one line in the log, and the log only grows: a correction is a new line.
Assistance with the view attached. With one tap the operator calls the drawing office or the production manager, with a fixed message, for example “dimension missing”. The call carries the workstation’s view: the panel, the layers and the part he tapped. Whoever takes the call sees what the operator saw, and the workstation sees that someone is on the way.
Materials, with a shortage in one tap. The screen shows what this panel needs at this workstation: the parts from the saw station, built-in items such as a window or a lifting loop, consumables and tools. Quantity, location and status come from the ERP. If something is missing, the operator reports the shortage, and the control center shows it.
What stays in the ERP
A control center is not a planning board. It shows, records and passes on. It makes no schedule and puts no order on the workstations: a project is put ready on a workstation, and the operator chooses which panel to take.
Planning, stock, orders and prices stay in the company’s ERP. The control center keeps no stock and orders nothing. A reported shortage is a fact it passes on to the ERP or to the warehouse; what happens next is decided by the ERP and the people who work with it. The log is not time registration for payroll either: it records what happened per workstation and per panel, not who worked how many hours.
Every workshop works differently
A timber-frame builder with four tables works differently from a precast concrete plant with a long line. That is why a template per sector fills in the settings, and the company chooses its own words: workstation, workbench or table, panel or element. The lists belong to the company too: the reasons to stop, the kinds of call, the materials per kind of workstation.
A company switches on only what it uses. Show is the model and the drawings at the workstation. Follow adds Start, Stop and Complete. Steer adds calls per kind and the materials. Connect links the whole with the ERP. What stays the same for everyone: only released work reaches the floor, the panel is what is followed, and the log only grows.